Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the cookie-law-info domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/adad2599/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the uael domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/adad2599/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wpforms-lite domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/adad2599/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/adad2599/public_html/wp-includes/functions.php on line 6121
Huntington Apartment – Advance Groups

“Advance went out of their way to assist us straightaway, visiting another building with me to see their design which we liked, then tailoring it to our budget. Thus, our finished lifts have an amazing appearance and functionality.”

Paula Lipton, Secretary of Body Corp Huntington Apartments.

Client

Huntington Apartments

BUILDING TYPE

High Rise Residential – Southport

CHALLENGES

Huntington Apartments approached Advance Global Elevators about replacing two lifts in this 16-story mixed-use building. As the building was built in the 1980s, the lift was very dated. It had ongoing problems with breaking down, and the Body Corp was spending too much money on service fees. It was difficult to source replacement parts because of its age – again, costing the Body Corp time and money.

SOLUTION

A decision was made to replace these elevators in the building with Advance Global Elevators. Two new MRL Elevators were installed in place of the old lifts. It wasn’t just important to deliver reliable lifts, but also to find equipment, doors, and interior materials that would blend in with the decor of the building. Advance kept the client informed of the project’s progress through verbal and written communication.

RESULTS

Advance Global Elevators services were delivered at a competitive price, by industry professionals, and as a result, Huntington Apartments now hasn’t just got new lifts, but also a lot of great investments in their building for the future. As a result, they can now depend on reliable lifts with ongoing services and a close relationship with Advance Global Elevators.